Expected vs actual cost validation
- Category
- Detect / Govern
- Creatures
- Configlitch (#8), Orphanite (#5), Loggle (#1), Egresso (#4)
Description
Comparing actual cost with a documented expectation, and investigating any difference rather than accepting it as "the new normal". Verify outcomes, not settings.
How to apply it
- Estimate expected cost per environment or change, then compare to actuals after each deployment (Configlitch).
- When cost is not what you expect, review, validate, explain the difference and record learnings.
- After a decommission, expect cost to reach zero; if not, something was left behind (Orphanite).
- Do the same around migrations and region moves (Egresso).
Examples
- Configlitch: a template did not parameterise database size, so every dev and test SQL database matched production. The higher cost was written off as an estimating error until a later review.
- Orphanite: a decommissioned application's cost did not fall as far as planned; the gap was hidden in a larger total, and 5k per month of unattached disks was found.
- Loggle: the team believed logging cost 25k per month; it was 50k.
Limitations
- Needs a recorded estimate and a scope to compare against; see FinOps scope per application.